[Source: MarchicaMed agency]
Marchica Sport will offer a number of facilities intended for the amateur, high level sportsmen and professional sportsmen in different disciplines. It will offer a set of sports infrastructures on 14 ha for the training and the high-level sports internships. The hotel infrastructure will have 5,000 beds.
The construction work will begin in 2017 and will end to deliver the complex in 2022.
MVRDV (NL)
24H Architecture (NL)
Groupe 3 Architectes (M)
Conix RDBM Architects (B)
Reichen et Robert & associés (F)
Consultants
Master Plan: JNC international (B)
Marina: Marc Pajot (F)
Golf resort: 2013
Marina 1: avril 2013
City of Atalayoun: 2014
City of Two Seas: 2014
Resort tourist: 2015 ~ 2020
Marchica Sport: 2017 ~ 2022
Orchards of Marchica: 2019 ~ 2025
Nador New Area: 2020
Lagoon: term 2025
Developer City of Two Seas
Atalayoun Golf Resort s.a. (M)
Atlas Hospitality Morocco s.a. (M)
Copyright © 2012-2019 Atalayoun.com. All rights reserved.
Budget: 46 billion DHM
Ground space: 8,000 ha
Maritime space: 11,550 ha
Images Marchica Med | arch. Reichen et Robert
Groupe 3 Architectes | arch. Jamal Lamiri Alaoui
Conix Architects | Vince FX synthetic imagery